Beit Mazia, Jerusalem
Jerusalem
Fixed enclosures
Year built 2009
450 m²
Span 18 m
Design and construction of a thermo-acoustic roof: a galvanized, oven-painted framework clad with perforated cassettes, rock wool, fire-treated timber boards, and standing-seam copper sheeting.
Build duration: 4 months
Warranty: 1 year
Architectural design: Roof Dagan (in-house design)
Structural design ✓